top of page
20240717_162808.jpg

Interior Projects

Finished Basement

We took this unfinished basement and turned it into a beautiful, usable space.  We included sanding the paint off the concrete floors to ensure the longevity of the tile, sealing the concrete block walls, and crown molding for a finishing touch.

basement before, back room.jpg
20231024_092039.jpg

Getting a home ready for sale

These homeowners needed to get their home ready to sell, so we did everything that their realtor asked.  Painting ceilings, walls, and baseboards throughout the home, along with replacing flooring on the main floor.  Soft washed the roof and siding and pressure washed the front porch and driveway (no pressure washing pictures because I forgot). We're willing to get paid after closing, so you can get top dollar for your home.  The project took 2 weeks to complete, 2500 sq ft of paint, 900 sq ft flooring and base boards, all exterior doors painted, and all the exterior washing.

Main Floor

Upstairs Painted

This is a master bedroom/bathroom remodel.  The project took 5 days and turned out just how the homeowner wanted.  Fresh paint, tile, and fixtures made it feel like new.

20210812_223340.jpg
20210812_223345.jpg
20230211_222149.jpg
20240113_142450.jpg
20240115_124450.jpg
20240115_124459.jpg
20240115_124506.jpg
IMG_7871 (2).jpg
IMG_7869 (2).jpg
20210810_194520.jpg
20210811_080623.jpg
20210812_223259.jpg
20210811_080744.jpg
20210812_223313.jpg
20210812_223217.jpg

Water, leak 1hour fix

Patch and paint a bedroom

bottom of page